Pre-Operational and Post-Operational Chemical Cleaning of Boiler, Process Piping for Refinery, Chemical Manufacturing and Gas Plant

VERChem has extensive experience in pre-commissioning boiler chemical cleaning, post-operational boiler chemical cleaning, process piping chemical cleaning and lube oil system oil flushing. Type of boiler design and process plant cleaned:
 
 # Drum Type - Natural and Forced Circulation Boiler, Once-Through, HRSG & Combined Cycle units.
 # Ethylene Plant, Olefins Plant, Chemical Plant. - Process Piping, Compressor Suction lines, Steam System, furnace.
 # Refinery - Process Piping, Compressor Suction lines, Steam System, Utility Boiler.
 # Gas Plant - CO2 Removal System, Acid Gas Removal System.
 # Steelmill - Hydraulic and Lube Oil System cleaning and flushing.
 # Papermill.
 # Pharmaceutical Plant - Ultrapure Water System.
 
Boiler tube bulging from overheating Heavy localized corrosion
   
Boiler Tube After Cleaning Boiler Tube After Cleaning
   

Boiler Steam drum internal after chemical cleaning

Steam Drum Downcomer Inlet after Cleaning

 

VERChem Asia Pacific Pte Ltd 2010  
|   Home   |   Services   |   Technologies   |   Projects   |   About Us   |   Contacts   |